Weaver Change order of queue does not effect crafting when items are missing

Summary:
When a Weaver started to craft an item and has already placed needed items on his workbench but can’t complete the work because some are missing changing the order of the queue does not make him stop to craft the item, he waits until needed items are available. Only deleting the item out of the queue helps and the weaver starts to craft the next item.

Steps to reproduce:
Craft an item (item A) where not all needed items are available
Craft sth. else (item B)
change the order of item A and B

Expected Results:
The weaver stops to craft the item A and starts to craft item B.

Actural Result:
The weaver waits until the needed items for item A are available.

Version:
Alpha 7 r 183

2 Likes