So I noticed that Hearthlings will continue to build scaffolding for features of the building that are already complete. In my case, a wall built with slabs on top of a cliff face. The wall was complete long before the scaffolding was taller than the Hearthlings.
It would be nice if they checked that the target of the scaffolding still needed work before continuing to raise the scaffolding.